skip to Main Content
+49 (0)2151 - 44 60 530 info@igsb.eu Intern

Under which climatic conditions can the intumescent be applied on the construction site?

  • Component temperature not below + 5°C, maximum + 40°C
  • Relative air humidity max. 80
  • Dew point distance during processing and drying ≥ 3 K
  • Protect the coating from weathering (rain) until the entire coating is finished and fully cured!
  • Ensure sufficient ventilation.

The above mentioned conditions are product-dependent. The manufacturer’s instructions must be followed.

Back To Top